2022 wholesale price Water Systems - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Well-run gear, qualified revenue workforce, and superior after-sales companies; We've been also a unified huge loved ones, anyone persist with the organization benefit unification, determination, tolerance for Bioreactor In Wastewater Treatment , Uf Filter Water Purifier , Membrane Bioreactor Process , Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation and sincerely welcome you to join us!
2022 wholesale price Water Systems - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering Direction Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.03  micron
Membrane Area 30m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint Size Φ24.5mm

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH Range 5-9 (2- 12 when washing) Neutral PH is better for bacterial culture
Particle Diameter <2mm Prevent sharp particles to scratch membrane
Oil & Grease ≤2mg/L Prevent membrane fouling/sharp flux decrease
Hardness ≤150mg/L Prevent membrane scaling

Application Parameters

Designed Flux 15~40L/m2.h
Backwashing Flux Twice the designed flux
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure ≤-35KPa
Maximum backwashing Pressure 100KPa
Operating Mode Continuous opeartion, intermittent backwashing air flushing
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.piece
Washing Period Clean water backwashing every 1~2h; CEB every 1~2 days;Offline washing every 6~12 months

(Above information is for reference only, please adjust

according to actual differential pressure change rule)


Product detail pictures:

2022 wholesale price Water Systems -
 MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for 2022 wholesale price Water Systems - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Nepal , Morocco , Paraguay , We have a good reputation for stable quality products, well received by customers at home and abroad. Our company would be guided by the idea of Standing in Domestic Markets, Walking into International Markets. We sincerely hope that we could do business with customers both at home and abroad. We expect sincere cooperation and common development!
  • The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Myra from Rio de Janeiro - 2017.10.25 15:53
    The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Atalanta from Porto - 2017.03.28 16:34
    Write your message here and send it to us