We always do the job to be a tangible group making sure that we can provide you with the good high quality as well as ideal value for
Water Cartridge
, Mbr Plant
, Ultrafiltration Process
, We sincerely count on exchange and cooperation with you. Allow us to move ahead hand in hand and attain win-win situation.
China Manufacturer for Uf In Ro System -
UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:
Applications
Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.
Filtration Performance
This product is proven to have below filtering effects according to the service conditions of different water sources:
Ingredient |
Effect |
SS, Particles > 1μm |
Removal Rate ≥ 99% |
SDI |
≤ 3 |
Bacteria, Viruses |
> 4 log |
Turbidity |
< 1NTU |
TOC |
Removal Rate: 0-25% |
*Above data is obtained under the condition that feeding water turbidity is < 25NTU.
Product Parameters

Technical Parameters
Filtering Type |
Outside-in |
Membrane Material |
Modified PVDF |
MWCO |
200K Dalton |
Membrane Area |
78m2 |
Membrane ID/OD |
0.8mm/1.3mm |
Dimensions |
Φ250mm*1710mm |
Connector Size |
DN50 Clamping |
Application Data
Pure Water Flux |
15,000L/H (0.15MPa, 25C) |
Designed Flux |
40-120L/m2.hr (0.15MPa, 25C) |
Suggested Working Pressure |
≤ 0.2MPa |
Maximum Transmembrane Pressure |
0.15MPa |
Maximum Backwashing Pressure |
0.15MPa |
Air Washing Volume |
0.1-0.15N m3/m2 .hr |
Air Washing Pressure |
≤ 0.1MPa |
Maximum Working Temperature |
45C |
PH Range |
Working: 4-10; Washing: 2-12 |
Operating Mode |
Cross Flow |
Feeding Water Requirements
Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.
Turbidity |
≤ 25NTU |
Oil & Grease |
≤ 2mg/L |
SS |
≤ 20mg/L |
Total Iron |
≤ 1mg/L |
Continuous Residual Chlorine |
≤ 5ppm |
COD |
Suggested ≤ 500mg/L |
*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.
Operating Parameters
Backwashing Flow Rate |
100-150L/m2.hr |
Backwashing Frequency |
Every 30-60min. |
Backwashing Duration |
30-60s |
CEB Frequency |
0-4 times per day |
CEB Duration |
5-10min. |
CIP Frequency |
Every 1-3 months |
Washing Chemicals: |
Sterilization |
15ppm Sodium Hypochlorite |
Organic Pollution Washing |
0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide |
Inorganic Pollution Washing |
1-2% Citric Acid/0.2% Hydrochloric Acid |
Component Material
Component |
Material |
Membrane |
Modified PVDF |
Sealing |
Epoxy Resins |
Housing |
UPVC |
Product detail pictures:
Related Product Guide:
Sincerity, Innovation, Rigorousness, and Efficiency is the persistent conception of our company for the long-term to develop together with customers for mutual reciprocity and mutual benefit for
China Manufacturer for Uf In Ro System -
UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Colombia
, Honduras
, moldova
, Ensuring high product quality by choosing nice suppliers, we have also implemented comprehensive quality control processes throughout our sourcing procedures. Meanwhile, our access to a large range of factories, coupled with our excellent management, also ensures that we can quickly fill your requirements at the lower prices, regardless the order size.