We pursue the administration tenet of Quality is exceptional, Provider is supreme, Name is first, and will sincerely create and share success with all clientele for
Mbr Treatment Plant
, Filtration Filter
, Membrane And Water Treatment
, We have professional products knowledge and rich experience on manufacturing. We always believe your success is our business!
China New Product Uf Water Treatment -
UF Membrane Module 9 inch PVDF Ultrafiltration Membrane Module UFf2860 Replacing Project – Bangmo Detail:
Applications
Drinking treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.
Filtration Performance
This product is proven to have below filtering effects according to the service conditions of different water sources:
Ingredient |
Effect |
SS, Particles > 1μm |
Removal Rate ≥ 99% |
SDI |
≤ 3 |
Bacteria, Viruses |
> 4 log |
Turbidity |
< 1NTU |
TOC |
Removal Rate: 0-25% |
*Above data is obtained under the condition that feeding water turbidity is < 25NTU.
Product Parameters

Technical Parameters
Filtering Type |
Outside-in |
Membrane Material |
Modified PVDF |
MWCO |
200K Dalton |
Membrane Area |
52m2 |
Membrane ID/OD |
0.8mm/1.3mm |
Dimensions |
Φ225mm* 1860mm |
Connector Size |
DN50 Clamping; Air Inlet – 10mm air pipe |
Application Data
Pure Water Flux |
8,000L/H (0.15MPa, 25C) |
Designed Flux |
40-120L/m2.hr (0.15MPa, 25C) |
Suggested Working Pressure |
≤ 0.2MPa |
Maximum Transmembrane Pressure |
0.15MPa |
Maximum Backwashing Pressure |
0.15MPa |
Air Washing Volume |
0.1-0.15N m3/m2 .hr |
Air Washing Pressure |
≤ 0.1MPa |
Maximum Working Temperature |
45C |
PH Range |
Working: 4-10; Washing: 2-12 |
Operating Mode |
Cross Flow or Dead End |
Feeding Water Requirements
Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.
Turbidity |
≤ 25NTU |
Oil & Grease |
≤ 2mg/L |
SS |
≤ 20mg/L |
Total Iron |
≤ 1mg/L |
Continuous Residual Chlorine |
≤ 5ppm |
COD |
Suggested ≤ 500mg/L |
*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.
Operating Parameters
Backwashing Flow Rate |
100-150L/m2.hr |
Backwashing Frequency |
Every 30-60min. |
Backwashing Duration |
30-60s |
CEB Frequency |
0-4 times per day |
CEB Duration |
5-10min. |
CIP Frequency |
Every 1-3 months |
Washing Chemicals: |
Sterilization |
15ppm Sodium Hypochlorite |
Organic Pollution Washing |
0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide |
Inorganic Pollution Washing |
1-2% Citric Acid/0.2% Hydrochloric Acid |
Component Material
Component |
Material |
Membrane |
Modified PVDF |
Sealing |
Epoxy Resins |
Housing |
UPVC |
Product detail pictures:
Related Product Guide:
We insist on offering premium quality manufacturing with superior business concept, honest product sales as well as and fast assistance. it will bring you not only the good quality product or service and huge profit, but significant is to occupy the endless market for
China New Product Uf Water Treatment -
UF Membrane Module 9 inch PVDF Ultrafiltration Membrane Module UFf2860 Replacing Project – Bangmo , The product will supply to all over the world, such as: Iran
, India
, Georgia
, Looking forward, we will keep pace with the times, continuing to create new products. With our strong research team, advanced production facilities, scientific management and good services, we will supply high quality products to our customers worldwide. We sincerely invite you to be our business partners for mutual benefits.