High Performance Uf Ro Filter - MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To create much more price for clients is our company philosophy; purchaser growing is our working chase for Microfiltration Membrane , Uf Membrane , Mbr Water Treatment , Sincerely look forward to serving you in the near future. You are sincerely welcome to visit our company to talk business face to face with each other and establish long-term co-operation with us!
High Performance Uf Ro Filter - MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo Detail:

Product Overview

MBR is a combination of membrane technology and bio-chemical reaction in water treatment. MBR filter the sewage in bio-chemical tank with membrane so that sludge and water are separated. On one hand, membrane rejects microorganisms in the tank, which greatly increase the concentration of activated sludge to a high level, thus the bio-chemical reaction of sewage degradation processes more rapidly and thoroughly. On the other hand, water output is clear and of high quality because of high precision of membrane.
This product adopts reinforced modified PVDF material, which will not peel or break when backwashing, meanwhile has good permeable rate, mechanical performance, chemical resistance and pollution resistance. ID & OD of reinforced hollow fiber membrane are 1.0mm and 2.2mm respectively, filtration precision is 0.1 micron. Filtration mode is outside-in, that is raw water, driven by differential pressure, permeates into the hollow fibers, while bacteria, colloids, suspended solids and microorganisms etc. are rejected in the membrane tank.

Applications

●Treatment, recycle and reuse of industrial waste water.
●Treatment of refuse leachate.
●Upgrade and reuse of municipal sewage.

Filtration Performance

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Technical Parameters

Structure Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.1  micron
Membrane Area 25m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 785mm×2000mm×40mm
Joint Size DN32

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Application Parameters

Designed Flux 10~25L/m2.h
Backwashing Flux 30~60L/m2.h
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure 0~-35KPa
Maximum backwashingPressure 100KPa
Operating Mode 9min Operation+1min Break/8min Operaetion+2min Break
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.pc
Washing Period Clean water backwashing every 2~4h; CEB every 2~4 weeks; CIP every 6~12 months

Using Conditions

There should be appropriate pretreatments before UF. If defoamer has to be used, please choose alcohol defoamer, silicone defoamer is forbidden.

Item Value
PH Range 5~9 (washing: 2~12)
Particle Size <2mm, no sharp particles
Oil & Grease ≤2mg/L
Hardness ≤150mg/L

Product detail pictures:

High Performance Uf Ro Filter -
 MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo detail pictures


Related Product Guide:

The organization keeps on the procedure concept scientific management, high quality and efficiency primacy, purchaser supreme for High Performance Uf Ro Filter - MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Latvia , Lisbon , Sudan , We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • In China, we have many partners, this company is satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Michaelia from British - 2018.07.27 12:26
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Elaine from Malawi - 2017.08.16 13:39
    Write your message here and send it to us