New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are experienced manufacturer. Wining the majority from the crucial certifications of its market for Ultrafiltration Mechanism , Cross Flow Ultrafiltration , Ultrafiltration And Reverse Osmosis , We're going to continually strive to improve our provider and give the very high quality products and solutions with aggressive charges. Any inquiry or comment is really appreciated. Please get hold of us freely.
New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering Direction Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.03  micron
Membrane Area 30m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint Size Φ24.5mm

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH Range 5-9 (2- 12 when washing) Neutral PH is better for bacterial culture
Particle Diameter <2mm Prevent sharp particles to scratch membrane
Oil & Grease ≤2mg/L Prevent membrane fouling/sharp flux decrease
Hardness ≤150mg/L Prevent membrane scaling

Application Parameters

Designed Flux 15~40L/m2.h
Backwashing Flux Twice the designed flux
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure ≤-35KPa
Maximum backwashing Pressure 100KPa
Operating Mode Continuous opeartion, intermittent backwashing air flushing
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.piece
Washing Period Clean water backwashing every 1~2h; CEB every 1~2 days;Offline washing every 6~12 months

(Above information is for reference only, please adjust

according to actual differential pressure change rule)


Product detail pictures:

New Arrival China Water Filter Replacement -
 MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

Along with the Client-Oriented small business philosophy, a rigorous high-quality handle system, highly developed producing machines and a powerful R&D group, we always supply high-quality products and solutions, whole heartedly services and aggressive costs for New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Brisbane , Holland , Bulgaria , We have sufficient experience in producing products according to samples or drawings. We warmly welcome customers from home and abroad to visit our company, and to cooperate with us for a splendid future together.
  • The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Rebecca from Oman - 2018.06.18 19:26
    We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Dale from Korea - 2018.12.14 15:26
    Write your message here and send it to us