New Delivery for Mbr Plant - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We can normally fulfill our respected consumers with our great excellent, great value and good provider due to we're much more specialist and extra hard-working and do it in cost-effective way for Membrane Bio Reactor , Ultra Filtration Water Filter , Filter System , Only for accomplish the good-quality product or service to satisfy customer's demand, all of our products have been strictly inspected before shipment.
New Delivery for Mbr Plant - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:

Applications

Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.

Filtration Performance

This product is proven to have below filtering effects according to the service conditions of different water sources:

Ingredient Effect
SS, Particles > 1μm Removal Rate ≥ 99%
SDI ≤ 3
Bacteria, Viruses > 4 log
Turbidity < 1NTU
TOC Removal Rate: 0-25%

*Above data is obtained under the condition that feeding water turbidity is < 25NTU.

Product Parameters

product-description1

Technical Parameters

Filtering Type Outside-in
Membrane Material Modified PVDF
MWCO 200K Dalton
Membrane Area 78m2
Membrane ID/OD 0.8mm/1.3mm
Dimensions Φ250mm*1710mm
Connector Size DN50 Clamping

Application Data

Pure Water Flux 15,000L/H (0.15MPa, 25C)
Designed Flux 40-120L/m2.hr (0.15MPa, 25C)
Suggested Working Pressure ≤ 0.2MPa
Maximum Transmembrane Pressure 0.15MPa
Maximum Backwashing Pressure 0.15MPa
Air Washing Volume 0.1-0.15N m3/m2 .hr
Air Washing Pressure ≤ 0.1MPa
Maximum Working Temperature 45C
PH Range Working: 4-10; Washing: 2-12
Operating Mode Cross Flow

Feeding Water Requirements

Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.

Turbidity ≤ 25NTU
Oil & Grease ≤ 2mg/L
SS ≤ 20mg/L
Total Iron ≤ 1mg/L
Continuous Residual Chlorine ≤ 5ppm
COD Suggested ≤ 500mg/L

*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.

Operating Parameters

Backwashing Flow Rate 100-150L/m2.hr
Backwashing Frequency Every 30-60min.
Backwashing Duration 30-60s
CEB Frequency 0-4 times per day
CEB Duration 5-10min.
CIP Frequency Every 1-3 months
Washing Chemicals:
Sterilization 15ppm Sodium Hypochlorite
Organic Pollution Washing 0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide
Inorganic Pollution Washing 1-2% Citric Acid/0.2% Hydrochloric Acid

Component Material

Component Material
Membrane Modified PVDF
Sealing Epoxy Resins
Housing UPVC

Product detail pictures:

New Delivery for Mbr Plant -
 UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo detail pictures

New Delivery for Mbr Plant -
 UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo detail pictures


Related Product Guide:

High-quality comes 1st; support is fore; business is cooperation is our small business philosophy which is regularly observed and pursued by our organization for New Delivery for Mbr Plant - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Mauritius , Plymouth , Romania , We are committed to meet all your needs and solve any technical problems you may encounter with your industrial components. Our exceptional products and vast knowledge of technology makes us the preferred choice for our customers.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Elaine from Angola - 2018.09.12 17:18
    We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Frances from Oman - 2017.11.01 17:04
    Write your message here and send it to us