Short Lead Time for Mbr Water - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enterprise since its inception, constantly regards product good quality as organization life, constantly improve production technology, strengthen merchandise high quality and continuously strengthen enterprise total good quality administration, in strict accordance with all the national standard ISO 9001:2000 for Uf Water Purifier , Mbr Modules , Ultra Filtration Unit , If you have the requirement for any of our products, please contact us now. We are looking forward to hearing from you soon.
Short Lead Time for Mbr Water - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:

Applications

Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.

Filtration Performance

This product is proven to have below filtering effects according to the service conditions of different water sources:

Ingredient Effect
SS, Particles > 1μm Removal Rate ≥ 99%
SDI ≤ 3
Bacteria, Viruses > 4 log
Turbidity < 1NTU
TOC Removal Rate: 0-25%

*Above data is obtained under the condition that feeding water turbidity is < 25NTU.

Product Parameters

product-description1

Technical Parameters

Filtering Type Outside-in
Membrane Material Modified PVDF
MWCO 200K Dalton
Membrane Area 78m2
Membrane ID/OD 0.8mm/1.3mm
Dimensions Φ250mm*1710mm
Connector Size DN50 Clamping

Application Data

Pure Water Flux 15,000L/H (0.15MPa, 25C)
Designed Flux 40-120L/m2.hr (0.15MPa, 25C)
Suggested Working Pressure ≤ 0.2MPa
Maximum Transmembrane Pressure 0.15MPa
Maximum Backwashing Pressure 0.15MPa
Air Washing Volume 0.1-0.15N m3/m2 .hr
Air Washing Pressure ≤ 0.1MPa
Maximum Working Temperature 45C
PH Range Working: 4-10; Washing: 2-12
Operating Mode Cross Flow

Feeding Water Requirements

Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.

Turbidity ≤ 25NTU
Oil & Grease ≤ 2mg/L
SS ≤ 20mg/L
Total Iron ≤ 1mg/L
Continuous Residual Chlorine ≤ 5ppm
COD Suggested ≤ 500mg/L

*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.

Operating Parameters

Backwashing Flow Rate 100-150L/m2.hr
Backwashing Frequency Every 30-60min.
Backwashing Duration 30-60s
CEB Frequency 0-4 times per day
CEB Duration 5-10min.
CIP Frequency Every 1-3 months
Washing Chemicals:
Sterilization 15ppm Sodium Hypochlorite
Organic Pollution Washing 0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide
Inorganic Pollution Washing 1-2% Citric Acid/0.2% Hydrochloric Acid

Component Material

Component Material
Membrane Modified PVDF
Sealing Epoxy Resins
Housing UPVC

Product detail pictures:

Short Lead Time for Mbr Water -
 UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo detail pictures

Short Lead Time for Mbr Water -
 UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo detail pictures


Related Product Guide:

With a sound enterprise credit history, exceptional after-sales services and modern production facilities, we've earned an outstanding track record amongst our consumers across the whole world for Short Lead Time for Mbr Water - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Argentina , India , Mauritius , To achieve reciprocal advantages, our company is widely boosting our tactics of globalization in terms of communication with overseas customers, fast delivery, the high quality and long-term cooperation. Our company upholds the spirit of innovation, harmony, team work and sharing, trails, pragmatic progress. Give us a chance and we will prove our capability. With your kind help, we believe that we can create a bright future with you together.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Florence from Egypt - 2017.07.07 13:00
    The company keeps to the operation concept scientific management, high quality and efficiency primacy, customer supreme, we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Nancy from Kyrgyzstan - 2017.09.30 16:36
    Write your message here and send it to us