With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for
Waste Water Filtration System
, Water Purification Membrane
, Membrane Pressure
, Our company has been devoting that customer first and committed to helping customers expand their business, so that they become the Big Boss !
Special Design for Bioreactor In Wastewater Treatment -
UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:
Applications
Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.
Filtration Performance
This product is proven to have below filtering effects according to the service conditions of different water sources:
Ingredient |
Effect |
SS, Particles > 1μm |
Removal Rate ≥ 99% |
SDI |
≤ 3 |
Bacteria, Viruses |
> 4 log |
Turbidity |
< 1NTU |
TOC |
Removal Rate: 0-25% |
*Above data is obtained under the condition that feeding water turbidity is < 25NTU.
Product Parameters

Technical Parameters
Filtering Type |
Outside-in |
Membrane Material |
Modified PVDF |
MWCO |
200K Dalton |
Membrane Area |
78m2 |
Membrane ID/OD |
0.8mm/1.3mm |
Dimensions |
Φ250mm*1710mm |
Connector Size |
DN50 Clamping |
Application Data
Pure Water Flux |
15,000L/H (0.15MPa, 25C) |
Designed Flux |
40-120L/m2.hr (0.15MPa, 25C) |
Suggested Working Pressure |
≤ 0.2MPa |
Maximum Transmembrane Pressure |
0.15MPa |
Maximum Backwashing Pressure |
0.15MPa |
Air Washing Volume |
0.1-0.15N m3/m2 .hr |
Air Washing Pressure |
≤ 0.1MPa |
Maximum Working Temperature |
45C |
PH Range |
Working: 4-10; Washing: 2-12 |
Operating Mode |
Cross Flow |
Feeding Water Requirements
Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.
Turbidity |
≤ 25NTU |
Oil & Grease |
≤ 2mg/L |
SS |
≤ 20mg/L |
Total Iron |
≤ 1mg/L |
Continuous Residual Chlorine |
≤ 5ppm |
COD |
Suggested ≤ 500mg/L |
*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.
Operating Parameters
Backwashing Flow Rate |
100-150L/m2.hr |
Backwashing Frequency |
Every 30-60min. |
Backwashing Duration |
30-60s |
CEB Frequency |
0-4 times per day |
CEB Duration |
5-10min. |
CIP Frequency |
Every 1-3 months |
Washing Chemicals: |
Sterilization |
15ppm Sodium Hypochlorite |
Organic Pollution Washing |
0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide |
Inorganic Pollution Washing |
1-2% Citric Acid/0.2% Hydrochloric Acid |
Component Material
Component |
Material |
Membrane |
Modified PVDF |
Sealing |
Epoxy Resins |
Housing |
UPVC |
Product detail pictures:
Related Product Guide:
Bear Customer initially, High quality first in mind, we do the job closely with our customers and supply them with efficient and skilled providers for
Special Design for Bioreactor In Wastewater Treatment -
UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Chicago
, Barcelona
, Roman
, We now have to continue to uphold the quality, detailed, efficient business philosophy of honest, responsible, innovativespirit of service, abide by the contract and abide by reputation, high quality goods and improve service welcome overseas customers patrons.